Regeneration of solar energy into electrical energy.
What are the possibilities of using this technology?
⬥ For example, the energy consumption of an existing facility with an electric power of 76 kW is 55,000 kW/h per month. x 2.16 UAH/kW.= 118,800.00 UAH. per month. Accordingly, per year, 118,800.00x12 months = UAH 1,425,600.00.
⬥ Installation of solar energy regeneration, with a capacity of 100 kW/h, costs UAH 2,700,000.00.
⬥ Power 1kW. solar battery produces 1100 kW / h. in year.
⬥ Installation power 100 kW. x1100 kW/h, per year =110,000 kW/h. in year.
⬥ The cost of electricity under the feed-in tariff, taking into account the payment of taxes, is 13.48 UAH/kW x 110,000 kW/h. = UAH 1,482,800.00 2,700,000.00 / 1,482,800.00 = 1.82.
⬥ Payback of the installation is less than two years.
There are three types of solar power plants.
⬥ Network
⬥ Hybrid
⬥ Offline
⬥ For PHYS. persons and JUR. Persons
Panels are of two types
⬥ Polycrystalline.
⬥ Monocrystalline.
Commercial solar power plant.
Household solar power plant.
There are already 50 such projects and 51 for 600 kW.
Schematic diagram of a photovoltaic installation
Minimum equipment:
Savings per year, %: 85%
Cost of turnkey PV power plant: 11,920 $
⬥ Possible economic effect from the generation of solar power plants for the year: 366 $
⬥ Savings per year: 85%
⬥ Expenditures for electricity from external networks per year (excluding PV): 432 $
⬥ Annual electricity consumption by the facility, kWh: 7,200
⬥ Cost of 1 kWh for other people: 0.060 $
⬥ Consumption indicators from PVS for the year, kW*g: 6,100
⬥ Average annual generation of solar power plants, kWh: 9,150
⬥ Consumption level from ext. networks, kWh: 1 100
⬥ Free excess energy from PPV kWh: 3,050
⬥ Battery power reserve: 8.0 kWh
⬥ Runtime from battery.R = 4 kW, hour: 2.0
⬥ Battery power reserve: 8.0 kWh
The main components of the FES included in the price:
PV module: JA Solar 72S30 540 /MR NS: 3,570 $
Hybrid inverter: Must PV18-5248 PRO 1f. 5 kW, 48V, 2 MPRT: 1,700 $
Module fixing kit (roof): StringSetter В14 XL (Kripter) 750 $
PV cable: TOP Cable 6 mm2 500 m (Spain). $600
Battery: LogicPower LPN-GL 12V 200 Ah $2,200
Consumables (AC cables, grounding, shields, circuit breakers, sealants, anchors, boxes, etc.): 1,000 $
DC/AC Protection: 400 $
Total equipment: 10,220 $
Technical survey work, development of a working scheme, installation of a solar power plant: 1,700 $
Warranty terms:
PV modules: JA Solar 72S30 540 /MR NS - 20 years
Inverter: Must PV18-5248 PRO 1ph. 5 kW, 48V, 2 MPPT. - 2 years
Battery: LogicPower LPN-GL 12V 200 Ah - 2 years
Basic equipment:
Savings per year, %: 93%
Cost of turnkey PV plant: 14,555 $
⬥ Possible economic effect from the generation of solar power plants for the year: 402 $
⬥ Savings per year, %: 93%
⬥ Expenditures for electricity from external networks per year (excluding PV): 432 $
⬥ Annual electricity consumption by the facility, kWh, kWh: 7,200
⬥ Cost of 1 kWh for other people: 0.060 $
⬥ Consumption indicators from PVS for the year, kWh: 6,700
⬥ Average annual generation of solar power plants, kWh: 13,500
⬥ Consumption level from ext. networks, kWh: 500
⬥ Free excess energy from PPV kWh: 6,800
⬥ Battery power reserve: 8.0 kWh
⬥ Runtime from battery.R = 4 kW, hour: 2.0
⬥ Battery power reserve: 8.0 kWh
The main components of the FES included in the price:
PV module: JA Solar 72S30 540 /MR NS 5 355 $
Hybrid inverter: Must PV18-5248 PRO 1f. 5 kW, 48V, 2 MPPT. 2,550 $
Module fixing kit (roof): StringSetter В14 XL (Kripter) 750 $
PV cable: TOP Cable 6 mm2 500 m (Spain). 600 $
Battery: LogicPower LPN-GL 12V 200 Ah 2,200 $
Consumable materials (cables of a replacement stream, grounding, shields, automatics, sealants, anchors, boxes and other). $1000
DC/AC protection. 400 $
Total hardware: 12,855 $
Technical survey work, development of a working scheme, installation of a solar power plant: 1,700 $
Warranty terms:
PV modules: JA Solar 72S30 540 /MR NS - 20 years
Inverter: Must PV18-5248 PRO 1ph. 5 kW, 48V, 2 MPPT. - 2 years
Battery: LogicPower LPN-GL 12V 200 Ah - 2 years
Maximum equipment
Turnkey cost of PPV 28,774 $
⬥ Possible average annual profit from PV generation, net of taxes: 6,862 $
⬥ Cost of 1 kWh of "green" tariff: 0.16 €
⬥ Average annual generation of solar power plants, kWh: 44,400
⬥ Energy transferred from the solar power plant to the grid, kWh: 44,400
The main components of the FES included in the price:
PV module: JA Solar JAM72S30-540/MR 540 Wp, Mono: 15,480 $
Inverter: HUAWEI SUN2000-30KTL-M3 (30KW, 3PH, 4MPPT): 2,600 $
Module mounting kit (ground): Domino XL V2-72 (Kripter): 6,468 $
PV cable: (set 500 m) KBE DB+ , 6 mm2, (Nimechchina): 571 $
Consumables (set). 1 000$
AC Protection: 255 $
Total hardware: 26,374 $
Technical research work.
Installation of solar FES.
Commissioning and commissioning: 2,400 $
Warranty terms:
PV modules: JA Solar JAM72S30-540/MR 540 Wp, Mono - 20 years
Inverter: HUAWEI SUN2000-30KTL-M3 (30 KW, 3 PHASE, 4 MPPT) - 5 years
Fastening system: Domino XL V2-72 (Kripter) - 10 years